A four-state task dependency board that derives the schedule from durations and links alone — a forward and backward pass, total and free float per task, the zero-float route drawn in the one accent colour, and a cyclic plan named rather than walked forever.
npx shadcn@latest add @zyeon/chart-critical-pathSign in or get a license at Zyeon UI to see its source and install it.